[an error occurred while processing this directive] [an error occurred while processing this directive]
[an error occurred while processing this directive]Development of Large Load Six-component Force Measurement Device and Attack Angle Device
Received date: 2017-12-11
Online published: 2025-05-29
孙侃 , 郑芳 , 刘丹 , 赵金海 , 杨中艳 . 大载荷六分力测量及攻角装置研制[J]. 弹箭与制导学报, 2018 , 38(6) : 121 -124 . DOI: 10.15892/j.cnki.djzdxb.2018.06.027
In order to satisfy test demand of engine, the large load six-component force measurement device and attack angle device are developed. The six-component force measurement device adopts assembled structure, integrating an in-situ calibration device. The accuracy of the six-component force measurement device is more than 1%, the axial force load is up to 50KN. Under the condition of large load, the maximum angle velocity of the attack angle device is up to 2°/s, the angle accuracy is 0.05°, and the range of angle is -4° ~ +4°. The locking device can not only lock up the equipment safely, but also release the equipment rapidly.
| [1] | 贺德馨 风洞天平[M]. 北京: 国防工业出版社, 2001: 147-454. |
| [2] | 李玉和, 李庆祥, 陈璐云, 等. 单轴柔性铰链设计方法研究[J]. 清华大学学报(自然科学版), 2002, 42(2): 172-474. |
| [3] | GAFFNEY R Design of Mach-4 and Mach-6 nozzles for the NASA LaRC 8-Ft high temperature tunnel: AIAA 2009-5368[R]. [S. l.]: AIAA, 2019. |
| [4] | 于常安, 王罗, 何显中, 等. 航空矢量喷管测试平台用六分量盒式天平结构设计[J]. 航空动力学报,2016,31(1):31-38. |
| [5] | 段武斌 大吨位六分力测量系统原位标定及数据处理方法研究[D]. 南京: 南京理工大学,2009. |
/
| 〈 |
|
〉 |